If the two dates are not divisible by the cycle, the Term cycle returned is expressed as days. Note, date1 and date2 are not inclusive, ie 10/1/2013 to 10/3/2013 is 2 months, rather than inclusive 10/1/2013 to 9/3/2013.
| Name | Type | Optional | ByRef | Description |
|---|---|---|---|---|
| date1 | Date | The begin date of the period. | ||
| date2 | Date | The end date of the period. | ||
| cycleMnemonic | String | The cycle (Mnemonic text). |
A finDateCycle object.